Fall 2011 Corrections

The editorial staff of Knitscene carefully reviewed this issue, attempting to ensure that all of the information presented was correct and complete. Unfortunately, a few errors made it into print. We apologize for any inconvenience these errors may have caused you.

Grand Palais Shawl, page 88, second column

Shawl
With cir needle, CO 3 sts. Knit 8 rows.
Next row K1f&b, k1, k1f&b—5 sts.
Knit 8 rows.

Inc row K1, k1f&b, knit to last 2 sts, k1f&b, k1—2 sts inc’d.
Rep last 9 rows 16 more times—39 sts.

Abbey Pullover

Lace Chart, page 80.
Row 23 of chart is corrected.

Summer 2011 Corrections

 

Lodi Cardigan, pages 69-70
The buttonholes are worked on the left-front band. Therefore, under Stitches section, correct reading is: “Buttonhole: (worked over 5 garter sts of left-front band) (RS) K2, yo, k2tog, k1. Under Yoke section, immediately before Row 1, it should be: “…buttonholes worked along left front…) Under Finishing, last sentence should read: “Sew buttons to right-front band, opposite buttonholes.

 

Embassy Scarf, page 86-87

Clarification: Row 8 is to be worked the same as Row 2 (dropping all yo’s off needle). Rows 9-12 Knit.

Winter 2011 Corrections

Uxbridge Cardigan
Yarn amount requirements: 9 (13, 14, 15, 17)

Page 77 (last column)

Midway down the column :
Size 39" only:
Next row (WS) Work in patt to mB, sl m, p3tog, turn-2 sleeve sts dec'd. (note that "sl 1" instruction taken off)

And under all sizes:
Next row (WS) Work in patt to mB, sl m, p3tog, turn.
The number of times to work the 4-row repeat is correct as printed.

Last paragraph of the column:
Next row (RS) Sl 1, sl m, knit to mG, sl m, work in patt to end.

 

 

Oana Shawl, page 84

The following instructions should be inserted after Row 16:

Row 17 [K1, yo] 2 times, ssk, k12, k2tog, yo, k1, yo, ssk, k12, k2tog, [yo, k1] 2 times—39 sts. Row 18 K1, yo, k3, yo, k2tog, k10, ssk, yo, p3, yo, k2tog, k10, ssk, yo, k3, yo, k1—41 sts.

And, Work Row 1 of Chart 1, placing markers (pm) as indicated by the blue lines on the chart—43 sts.

Nora Dress
page 61
First column

There were missing asterisks in 2 places: Rnd 1 and under Note, Inc Rnd. Should read:

Rnd 1 *Knit to 2 sts before dart m, k2tog, sl m, knit to next m, sl m, ssk; rep from * once more…
Inc rnd *Knit to dart m, M1, sl m, knit to next m, sl m, M1; rep from * once more…

Winter/Spring 2011 Corrections

Belvedere Cardigan, page 46-47

Correction to chart size designations on right and left front charts posted February 15, 2011.

Download here

 

Magnanimity Cardi, page 56
Finishing section

Place 35 (39, 41, 47, 51) back neck sts from holder onto smaller cir needle. Right-front neckband: With RS facing, place 8 right-front band sts onto smaller dpn and rejoin yarn. Next row (RS) Work band in patt to last st, sl 1 kwise, pick up and knit 1 st along back neck edge, psso. Next row (WS) Sl 1 pwise with yarn in front (wyf), work band in patt. Rep last 2 rows 4 more times. Next row (RS) Work band in patt to last st, ssk last st tog with 1 back neck st. Next row (WS) Sl 1 pwise with yarn in front (wyf), work band in patt. Rep last 2 rows 16 (18, 19, 22, 24) more times. Leave sts on needle. Left-front neckband: With WS facing, place 8 left -front band sts onto smaller dpn and rejoin yarn. Next row (WS) Work in patt to last st, sl 1 pwise, pick up and purl 1 st along back neck edge, psso. Next row (RS) Sl 1 pwise with yarn in back (wyb), work band in patt. Rep last 2 rows 4 more times. Next row (WS) Work in patt to last st, p2tog last st of band with 1 back neck st. Next row (RS) Sl 1 pwise with yarn in back (wyb), work band in patt. Rep last 2 rows 17 (19, 20, 23, 25) more times. With RS tog, join ends of band using three-needle bind-off. Sew sides and bottoms of pocket linings to WS of fronts. Sew buttons to left front opposite buttonholes. Weave in ends. Block to measurements.