Spring 2012

  • Grays Ferry Cowl, page 60    
    Chart key: Work the increases in the chart pattern as M1, not k1f&b.

Summer 2012

  • Dapple Balero, page 77      
    Chart key: The knit symbol should say, "k on RS, p on WS," and the purl symbol should say, "p on RS, k on WS."

Fall 2012

  • Gypsy Petticoat, page 83
    Yarn amount change: 2 skeins of D for all sizes.
  • Serpentine Hat, page 87
    Chart A has been corrected to take out the extra stitch in row 7. Revised chart here.
  • Huntress Shawl, page 86
    Left Side of the shawl, for Row 1 and all WS rows, it should say "K2, purl to last 3 sts, K3." 

Winter 2012

  • Farmstead Cardigan, pages 78-81

Row 4 of the collar instructions on page 81 should read: P1, *p2, RT: rep from * to last 3 sts, p3.

  • Sheila Cardigan , pages 68-69.

Corrected Chart for smaller sizes.
Corrected Chart for larger sizes.
Yoke
With cir needle, CO 131 (139, 139, 139, 155) sts. Do not join. Next row (WS) P2, k1, p2, place marker (pm), work Row 1 of chart for your size to last 5 sts, pm after each rep, p2, k1, p2. Buttonhole row (RS) K2, p1, k2, sl m, work chart to last 5 sts, sl m, k1, ssk, yo, k2.

  • Sideways Ripples Shawl, pages 56-57.

The marker on the last WS row before each Short-row Section should be placed at the beginning of the row, instead of at the end. For example, the last WS row before Section 1 should read “K26, pm, knit to end,” instead of "Knit to last 26 sts, pm, knit to end."
The last WS row before Short-row Section 18 should read, “Next row (WS) K8, pm, knit to end.”

Replace Short-rows 1–6 of Short-row Section 18 with:
Short-row 1 (RS) Knit to m, remove m, wrap next st, turn.
Short-row 2 (WS) P8, pm, purl to last 2 sts, k2.
Short-rows 3–5 Rep Short-rows 1 and 2 once more then work Short-row 1 once more.
Short-row 6 Purl to last 2 sts, k2.

Accessories 2012

Supernova Cowl, page 109
Marker should be moved at beginning of chart Row 9, instead of Row 1. Instructions are corrected as follows:

“…work Rows 1–8 of Lace chart once. Remove m, sl 1 pwise with yarn in back, pm for new beg of rnd. Work chart Rows 9 and 10. Rep Rows 1–10 of Lace chart 4 more times, moving m as before at beg of Row 9 of chart.”